Capital City Grange

  • Email
  • Facebook
  • YouTube
  • Grange Notes
  • Photo Gallery
  • Contact Us
  • Home
  • About Us
    • About Us
    • History of the Capital City Grange
    • Grange Officers & Committees
    • Contact Us
    • Grange Notes
  • Dancing
    • Contra Dancing
    • Afro-Caribbean Dance
  • Rentals
  • Support the Hall
    • DONATE
    • Friends of the Capital City Grange Hall
    • Hall Projects
    • Completed Projects
  • Community
  • Calendar
You are here: Home / Gallery / January 2, 2020: sheetrock & FRPs delivered

January 2, 2020: sheetrock & FRPs delivered

June 14, 2020 by Tim Swartz

Jan. 2–the Kamco truck came with this small “Moffett” forklift attached to the back, which the driver is using to lift down the stack of sheetrock, with the Fiberglass Reinforced Panels (FRPs) on top.
With the panels set on the ground by the fire exit door, Stan Carlson and Sam Planck bend an FRP to get it started down the stairs.
Jill Murphy and Thomas Begley move an FRP past the plastic, to the temporary work-site storage location in the alcove between the kitchen and the fire exit stairs.
Sam and Dean Grondin bring a piece of sheetrock (moisture and mold-resistant type) down the stairs.
Stan and Kurt Giavara pick up one of the last pieces of sheetrock.

Filed Under: Gallery, Hall Projects

Contact Us

Tim Swartz, President, CCG#469
802-225-8921 (cell)
grangepresident@capitalcitygrange.org

 

Recent Posts

  • Saturday: It’s Cobbler time at the Grange!
  • Saturday: Bob Dylan Wanna Be contest for People’s Health & Wellness Clinic!
  • Grange updates: Phyllis gets lots of cards! April 5 program reminder

Copyright © 2025 · Outreach Pro on Genesis Framework · WordPress · Log in