Big band jazz at the Grange Hall!

July 17, 2022 by Tim Swartz

Green Mountain Swing band at the Grange Hall, bringing us the big band sound!

Filed Under: Gallery

2020 VT State Grange Resolutions–results

October 29, 2020 by Tim Swartz

Here are the actions the State Grange session on Oct. 18th took on the Resolutions proposed by various Community Granges around the state.   If you have questions, please feel free to contact Tim Swartz, President of Capital City Grange:  grangepresident@capitalcitygrange.org.   I was the lone Delegate to the 2020 State Grange session held at the Capital City Grange.

20-10-18 VSG Action on Resolutions

Filed Under: Uncategorized

“Second Stage” renovation: Big changes for our lower level!

June 15, 2020 by Tim Swartz

Floor plan and general description

The drawing below shows the basement floor plan, updated with the changes we made in the renovations which started in mid-December 2019, and were completed in March. These renovations were planned and carried out by the “Friends of the Capital City Grange Hall”, and were 50% funded by a “Cultural Facilities Improvement” grant from the VT Arts Council. The remaining 50% was largely raised from Grange Hall users and the Grange itself. Construction financing was supplied by the VT State Grange. We are very grateful to all of these organizations and individuals, who make the improvements of our Community Grange Hall possible!

Filed Under: Gallery, Hall Projects

Stage by stage construction photos

May 11, 2020 by Tim Swartz

December 2019: prep for the basement renovation begins!

19-12-15 #01 Stan Carlson removes window trim
19-12-15 #02 obsolete wiring removed from ceiling
19-12-15 #03 East wall with wiring removed
19-12-15 #04 Upstairs (obsolete) media connection plate–back side
19-12-15 #05 Upstairs (obsolete) media connection plate–front side.
19-12-17 basement with project prep & covered Kids Trade And Play storage shelves
19-12-22 #01 Patty Giavara preps for more plastic-taping
19-12-22 #02 Kurt Giavara walks along the prepped East wall
19-12-22 #03 Stan Carlson removes the stairs & landing
19-12-22 #04 Stairs and landing removed
19-12-22 #05 The stairway is blocked off, to prevent anyone accidentally taking the “big step” where the landing used to be!

Filed Under: Gallery, Hall Projects

December 23, 2019: Basement renovation begins in earnest!

May 11, 2020 by Tim Swartz

On the Monday before Christmas, Dec. 23rd, Northern Basements arrived, right on schedule, to begin their part of the work. The pictures below show how much they accomplished in the first day!

#01 Northern Basement truck & trailer arrives by the fire-exit door, on the West side of the building.
#02 The Northern Basemenst truck has gravel for the drainage channel ready.
#03 Northern Basements trailer, with the unloaded insulation panels, and the sump for the drain channel.
#04 Drainage channel has been installed in the jack-hammered channel under where the stairs and landing were removed.
#05 Drainage channel has been installed along the East wall, sitting on the footing.
#06 The jack-hammered space has been filled with gravel around the drainage channel.
#07 The drainage channel under the stairs has been covered with concrete.
#08 A drainage channel access port has been installed, so that the channel can be flushed out if it ever clogs up. The channel itself has been covered by concrete. Note that the flange of the channel has a space behind it, so that any water that makes it through the wall will drain into the channel.
#09 The drainage channel extends along the entire East wall, covered with concrete.
#10 The crack in the East wall, one of the places water has come into the basement, is covered with a waterproof barrier, which will direct any leakage into the drainage channel.
#11 The new sump, with pump installed, has been set into the floor and covered with concrete. The white PVC pipe will be connected to a drain line, eventually draining to the far side of the driveway, well away from the building.
#12 Foam insulation panels have been stacked in the basement, ready for installation after Christmas.

Filed Under: Gallery, Hall Projects

« Previous Page
Next Page »

Contact Us

Tim Swartz, President, CCG#469
802-225-8921 (cell)
grangepresident@capitalcitygrange.org

 

Recent Posts

  • March at the Grange: meeting on the 7th, 10th anniversary of KT&P
  • Erica Heilman report, sample padded chairs, May 3rd for the First Degree!
  • Feb. 7 Grange meeting & Rumblestrip VT program

Copyright © 2026 · Outreach Pro on Genesis Framework · WordPress · Log in