We are pleased to have a newly improved driveway and parking lot. We contracted with Matt Dwyer, who previously filled in a gully that was developing in our parking lot to fix up the eroded driveway, and to improve the parking lot to reduce the chance of more erosion there. Matt works on getting water to spread out and slow down as it runs off, rather than concentrating in channels which can lead to more erosion. On Friday, Nov. 18th he added crushed granite to the parking lot outside the new entrance, and created a shallower, flatter slope to spread out the flow of water. He re-graded the driveway to slope gently sideways–to the Hall side at the top, and to the road side farther down. We appreciate getting the work done before the winter storms that started on the 20th! Here are a couple of pictures: