January 2, 2020: sheetrock & FRPs delivered June 14, 2020 by Tim Swartz Jan. 2–the Kamco truck came with this small “Moffett” forklift attached to the back, which the driver is using to lift down the stack of sheetrock, with the Fiberglass Reinforced Panels (FRPs) on top. With the panels set on the ground by the fire exit door, Stan Carlson and Sam Planck bend an FRP to get it started down the stairs. Jill Murphy and Thomas Begley move an FRP past the plastic, to the temporary work-site storage location in the alcove between the kitchen and the fire exit stairs. Sam and Dean Grondin bring a piece of sheetrock (moisture and mold-resistant type) down the stairs. Stan and Kurt Giavara pick up one of the last pieces of sheetrock.