Basement renovation–sheetrock moving & carpentry work! 7AM to 5 PM
January 2, 2020 @ 8:00 am - 5:00 pm
7:00 AM: Delivery truck arrives with 44 sheets of 5/8″ fire-code, mold-resistant sheetrock, plus 27 FRPs–“Fiberglass Reinforced Panels” which will be used on stairwell walls and basement wall. Panels will be lifted off the truck and stacked on the ground.
9:00 AM: Volunteers will carry the sheetrock and FRPs down the fire exit stairs, so they can be start being installed over the foam insulation panels.